MOWAA Publishes Audited Accounts, Puts Institute Cost at N22.26bn
Oluchi Chibuzor The Museum of West African Art (MOWAA) has disclosed that the total cost of building and equipping its Institute in Benin City was N22.26 billion, with the Edo
Aggregated · originally by ThisDay
26 Sept 2026, 07:31 WAT · 3 min read
Oluchi Chibuzor The Museum of West African Art (MOWAA) has disclosed that the total cost of building and equipping its Institute in Benin City was N22.26 billion, with the Edo
ADVERTISEMENTNative